Building systems
Turn Building System Data Into Operational Action
Your building management system already knows something is wrong. The gap is between that knowledge and an accountable, recorded response.
The business problem
The BMS raises alarms into a room, not a workflow
Building system alarms are displayed on a console in a control room. They are acknowledged verbally, cleared without a record, and produce a work order only if someone chooses to raise one manually. The BMS holds the technical truth while the service record holds something different.
The IntelliGrid approach
Point mapping, then automation
Building system points are mapped to assets and locations in the IntelliGrid register, so an incoming event arrives with meaning. Severity classification, correlation and rule-based conversion then produce assigned work automatically, with the originating event retained as evidence.
Capabilities
Integration scope
Connectivity is established per site against the systems actually installed. Protocol and gateway support is confirmed during technical discovery rather than assumed.
BMS
Building management system alarms, status and setpoint data.
CCMS
Central control and monitoring system events across plant.
SCADA
Supervisory control data where industrial systems are present.
Gateway integration
Protocol gateways used where direct interfaces are unavailable.
Energy meters
Consumption and demand data for operational and ESG use.
Point mapping
System points associated with assets, systems and locations.
Event normalisation
Different alarm vocabularies reduced to one classification.
Read-oriented integration
Monitoring and workflow generation, with any control scope defined explicitly.
Workflow
BMS event to closure
STEP 1
BMS
Building system detects an out-of-range condition.
STEP 2
Event
Alarm and associated telemetry passed to IntelliGrid.
STEP 3
IntelliGrid
Event normalised, deduplicated and classified.
STEP 4
Asset
Matched to the asset record with history and criticality.
STEP 5
Priority
Severity and criticality determine priority and SLA.
STEP 6
Work Order
Assigned, executed, verified and closed.
Business benefits
Connects with
Frequently asked
Can IntelliGrid connect to our existing BMS?
In most cases yes, and the platform is designed to sit above building systems rather than replace them. The available interface — vendor API, gateway or protocol bridge — is established during technical discovery, and point-to-asset mapping is part of deployment.
Does IntelliGrid control building plant?
The standard deployment is monitoring and workflow generation. Any control scope is defined explicitly with the client and the building system integrator, and is not assumed.
Connect your building systems
Tell us which systems are installed and we will outline a realistic integration approach.